Checking your surface and the rules
Whether the rules cover the spot you have in mind.
Read this onePlug-in Solar West Midlands / Telling National Grid
After the panel goes in there's a short form for the network operator, due within 28 days. We do it with you.
Your network operator is the company that owns the cables and the substations in your street. It is not your electricity supplier and you do not choose it. On our working map the operator for the West Midlands licence area is National Grid Electricity Distribution (West Midlands) plc.
That map came from a general reference rather than from the operator, so we mark it as provisional and we do not treat it as settled for your postcode.
Two ways. Type your postcode into the checker on the operator’s own website, or dial 105. That number is free, it reaches the distribution network operator holding your address, and it is right for every postcode in England, Scotland and Wales.
We will do this with you rather than leave you to it.

You have 28 days from installing the device to complete the operator’s online form. It wants a name, an email address, and the address the device went in at. Government’s own assessment of the scheme reckons on five to ten minutes.
This is Great Britain only. Northern Ireland is outside the GB network and has its own arrangements.
The product specification allows one device on each final ring circuit in the house. Network connection rules are tighter than that. Engineering Recommendation G98 Issue 2 Amendment 1 was approved by Ofgem on 11 August 2026, came into force on 27 August 2026, and holds you to a single device for the whole home. That is the number to work to, and it stands until the rule itself changes.
A manufacturer may not put one of these on the market in Great Britain until the device has been type tested to G98, listed on the ENA Type Test Register and confirmed as compliant. A kit missing from that register has been through no assessment.
We look up the register entry before anyone orders anything. This page rests on Ofgem’s publication about the G98 change, the government’s final stage impact assessment and the interim product specification, all read on 13 September 2026.
Give us the postcode and tell us what that part of the house is built from. We will say which way it falls.
Send us your postcodeSend the postcode. We'll tell you.

Name, postcode, email, and the spot you're thinking of. Back comes an email with what the rules say and what that spot should generate in a year.
Email replies only. Your details go nowhere else and we take no commission.